10 of 10| Date | Record | Device | Type | Work performed / findings | Technician | Result | Next due |
|---|---|---|---|---|---|---|---|
| 27 Oct 2026 | MR-2293 | BME-01022C-arm fluoroscopy | inspection | Annual radiation safety survey and collimator check.Collimator light field within 1.5% of SID.Parts: NoneCA9-RS-survey.pdf | Rafael Alvarez | pass | 27 Oct 2027 |
| 09 Oct 2026 | MR-2288 | BME-05101Bedside patient monitor | preventive | Annual PM: NIBP calibration, SpO2 simulator, ECG leads, alarms.NIBP within 2 mmHg. Hose cracked at connector.Parts: NIBP hose 71-0021 | Mei Chen | pass | 09 Oct 2027 |
| 22 Sep 2026 | MR-2281 | BME-02040Transport ventilator | emergency | Called to ED: unit would not power on battery. Battery contacts cleaned, pack reseated.Corrosion on battery contacts.Parts: None | Mei Chen | pass | 22 Mar 2027 |
| 03 Sep 2026 | MR-2276 | BME-01011128-slice CT scanner | inspection | Radiation output and image quality phantom, dose index check.CTDIvol within 4% of baseline.Parts: NoneAX128-QA-0903.pdf | Rafael Alvarez | pass | 03 Dec 2026 |
| 11 Aug 2026 | MR-2270 | BME-06003Electrosurgical unit | corrective | Return electrode monitoring fault investigated, footswitch cable replaced.Intermittent REM alarm traced to cable strain relief.Parts: Footswitch cable 62-0450 | Mei Chen | conditional | 11 Feb 2027 |
| 07 Jul 2026 | MR-2263 | BME-05160Monitor / defibrillator | preventive | Annual PM: energy delivery at 50/150/200 J, pacing output, ECG simulator.Original battery at 71% capacity, replaced.Parts: Battery pack 44-0310 | Rafael Alvarez | pass | 07 Jul 2027 |
| 18 Jun 2026 | MR-2260 | BME-010011.5T MRI scanner | inspection | Quarterly vendor inspection: helium level, cold head, RF coil checks.Helium 81%, compressor hours 41,220.Parts: NoneNordmark-FSR-0618.pdf | Rafael Alvarez | pass | 18 Sep 2026 |
| 02 May 2026 | MR-2251 | BME-02011ICU ventilator | preventive | Annual PM with O2 cell and expiratory valve replacement, calibration.O2 cell at end of life (reads 4% low).Parts: O2 cell 30-2201, exp. valve membrane 30-1180VT900-PM-2026.pdf | Rafael Alvarez | pass | 02 Nov 2026 |
| 14 Apr 2026 | MR-2244 | BME-04217Volumetric infusion pump | preventive | Semi-annual PM. Drug library updated to v14.Door seal worn on hinge side, replaced.Parts: Door seal kit 81-1044 | Mei Chen | pass | 14 Oct 2026 |
| 14 Oct 2025 | MR-2201 | BME-04217Volumetric infusion pump | preventive | Semi-annual PM: flow accuracy, occlusion pressure, battery run-down, electrical safety.Flow accuracy within 2.1%. Battery 96%.Parts: NonePM-checklist-04217.pdf | Rafael Alvarez | pass | 14 Apr 2026 |
- 27 Oct 2026 · MR-2293pass
Annual radiation safety survey and collimator check.
Collimator light field within 1.5% of SID.
Rafael Alvarez · Next due 27 Oct 2027
- 09 Oct 2026 · MR-2288pass
Annual PM: NIBP calibration, SpO2 simulator, ECG leads, alarms.
NIBP within 2 mmHg. Hose cracked at connector.
Mei Chen · Next due 09 Oct 2027
- 22 Sep 2026 · MR-2281pass
Called to ED: unit would not power on battery. Battery contacts cleaned, pack reseated.
Corrosion on battery contacts.
Mei Chen · Next due 22 Mar 2027
- 03 Sep 2026 · MR-2276pass
Radiation output and image quality phantom, dose index check.
CTDIvol within 4% of baseline.
Rafael Alvarez · Next due 03 Dec 2026
- 11 Aug 2026 · MR-2270conditional
Return electrode monitoring fault investigated, footswitch cable replaced.
Intermittent REM alarm traced to cable strain relief.
Mei Chen · Next due 11 Feb 2027
- 07 Jul 2026 · MR-2263pass
Annual PM: energy delivery at 50/150/200 J, pacing output, ECG simulator.
Original battery at 71% capacity, replaced.
Rafael Alvarez · Next due 07 Jul 2027
- 18 Jun 2026 · MR-2260pass
Quarterly vendor inspection: helium level, cold head, RF coil checks.
Helium 81%, compressor hours 41,220.
Rafael Alvarez · Next due 18 Sep 2026
- 02 May 2026 · MR-2251pass
Annual PM with O2 cell and expiratory valve replacement, calibration.
O2 cell at end of life (reads 4% low).
Rafael Alvarez · Next due 02 Nov 2026
- 14 Apr 2026 · MR-2244pass
Semi-annual PM. Drug library updated to v14.
Door seal worn on hinge side, replaced.
Mei Chen · Next due 14 Oct 2026
- 14 Oct 2025 · MR-2201pass
Semi-annual PM: flow accuracy, occlusion pressure, battery run-down, electrical safety.
Flow accuracy within 2.1%. Battery 96%.
Rafael Alvarez · Next due 14 Apr 2026